Our Company-owned and operated platform at Vermilion 170 was designed with a capacity of 60 Mmcfd and 2,000 bopd. This platform services natural gas and condensate production from our Vermilion 170 well, which flows via the Sea Robin Pipeline to onshore processing plants.

In January 2013, production was shut-in at our Vermilion 170 well and operations were conducted to replace the tubing and casing and restore the well, which resumed production in June 2013. During December 2014, our Vermilion 170 well was shut-in for fourteen days due to issues with the Sea Robin Pipeline.

For the year ended December 31, 2015, Vermilion 170 was producing at a rate of 7.0 Mmcfed, net to Contango.  Proved reserves at Vermilion 170 are 9.6 Bcfe as of December 31, 2015.   

 

 